Production Planning — NexavionERP
Manufacturing/Production Planning
Ana Kowalski
ana@meridianco.com
Log Out

Production Planning

Work orders for what engineering has released, and what sales and supply have asked to build

Open Work Orders74
Working set on this screen
Planned Production18,420 units
Kingston and Montego Bay
Components Reserved92.6%
Booked to open orders
Release rule
A released work order shows component reservation before it is treated as ready to run
Released work order requires component reservation
Blocked — component reservation required before release

Outdoor CPE MO-4426 is still Planned. Connector CMP-CON-LC on MO-4414 is only partly reserved. Shortage follow-up sits on requisition.

Manufacturing cost
Material, labour, machine and overhead for one finished ONT Starter Kit
MaterialJMD 18,400
LabourJMD 4,800
MachineJMD 3,100
OverheadJMD 2,700
Total manufacturing costJMD 29,000

Finished-unit standard for ONT Starter Kit Rev C. The same JMD 29,000 is shown on shop-floor WIP and manufacturing analytics. Margin analysis reads it from product costing, cost centre CC-MFG-KIN.

Work Orders
MO-4414 is 40 ONT Starter Kits for SO-4402, Rev C, due 22 Oct 2026. Open Work Orders 74 is the wider book.
0 selected
Work OrderProductRevisionSourceManufacturing ModeFulfilment StrategyPlanned QtyDue DateReservedStatus
MO-4414ONT Starter KitCSO-4402DiscreteMake-to-Order4022 Oct 2026ReservedIn Progress
MO-4426Outdoor CPEBManualDiscreteEngineer-to-Order1218 Dec 2026ShortPlanned
MO-4418Fibre Cable AssemblyBplanned orderProcessMake-to-Stock30 km28 Oct 2026ReservedReleased
MO-4422Optical Splitter AssemblyASO-4410DiscreteAssemble-to-Order8004 Nov 2026PartialReleased
MO-4430SIM Starter PackAForecastRepetitiveMake-to-Stock4,00015 Nov 2026ReservedPlanned
MO-4434Network Power UnitAManualDiscreteMake-to-Stock2420 Nov 2026ReservedReleased
MO-4438Field Installation KitAPRJ-14ProjectMake-to-Order1602 Dec 2026PartialIn Progress
MO-4440Parish splice kitANorth Parish NetworksContractMake-to-Order6012 Nov 2026ReservedReleased
MO-3182Sensor kit — industrial v37ManualDiscreteMake-to-Stock2,40009 Aug 2026ReservedIn Progress
MO-3180Field tablet 10in rugged9ManualDiscreteMake-to-Stock80011 Aug 2026ReservedIn Progress
MO-3178Gateway module 5G4ManualDiscreteMake-to-Stock3,60014 Aug 2026PartialPlanned
MO-3175POS terminal compact2ManualDiscreteMake-to-Stock60008 Aug 2026ReservedIn Progress
MO-3172Access point outdoor3ManualDiscreteMake-to-Stock1,50018 Aug 2026ShortPlanned
MO-3169Charging dock 8-bay6ManualDiscreteMake-to-Stock1,20002 Aug 2026ReleasedComplete
No records match this filter.
Production Plans
Demand is shown as recorded. No planning run is performed.
0 selected
Plan IDProductDemand SourceQuantityStart DateDue DateWork CentreStatus
PLN-14ONT Starter KitSO-44024012 Oct 202622 Oct 2026WC-OPTReleased
PLN-18Fibre Cable Assemblyplanned order30 km14 Oct 202628 Oct 2026WC-REELReleased
PLN-22SIM Starter PackForecast4,00001 Nov 202615 Nov 2026WC-KITPlanned
PLN-26Field Installation KitPRJ-141618 Nov 202602 Dec 2026WC-KITIn Progress
PLN-08Sensor kit — industrial v3Manual2,40004 Aug 202609 Aug 2026Line 4In Progress
No records match this filter.
Reservations
Component stock stays in Inventory. This list is the manufacturing claim on it.
0 selected
Reservation IDWork OrderComponentRequired QtyReserved QtyLocationLotStatus
RSV-4414-1MO-4414CMP-HSG-02 Housing4040Kingston Main WarehouseLOT-HSG-14Reserved
RSV-4414-2MO-4414CMP-PCB-14 PCB4040Kingston Main WarehouseLOT-PCB-14Reserved
RSV-4414-3MO-4414CMP-OPT-03 Optical module4040Kingston Main WarehouseLOT-OPT-118Reserved
RSV-4414-4MO-4414CMP-CON-LC Connector4020Kingston Main Warehouse—Partial
RSV-4426-1MO-4426Outdoor enclosure120Kingston Main Warehouse—Short
No records match this filter.
Discrete

Build a defined unit from a BOM and routing.

ExampleONT Starter Kit, MO-4414, 40 units.
PlanningWork order from a sales order.
In use
Process

Recipe, batch size and yield.

ExampleFibre Cable Assembly, 30 km campaign.
PlanningCampaign on WC-REEL.
In use
Repetitive

Rate-based runs of the same item.

ExampleSIM Starter Pack, 4,000.
PlanningForecast plan PLN-22.
Planned
Project

Tied to a project structure.

ExampleField Installation Kit, 16 for PRJ-14.
PlanningProject demand.
In use
Contract

Built for a named contract.

ExampleParish splice kit, 60 for North Parish Networks.
PlanningContract work order.
Released
Nexavion AI● Online
Ask about anything in Manufacturing — try: