Production Planning
Work orders for what engineering has released, and what sales and supply have asked to build
Open Work Orders74
Working set on this screen
Planned Production18,420 units
Kingston and Montego Bay
Components Reserved92.6%
Booked to open orders
Release rule
A released work order shows component reservation before it is treated as ready to run
Released work order requires component reservation
Blocked — component reservation required before release
Outdoor CPE MO-4426 is still Planned. Connector CMP-CON-LC on MO-4414 is only partly reserved. Shortage follow-up sits on requisition.
Manufacturing cost
Material, labour, machine and overhead for one finished ONT Starter Kit
MaterialJMD 18,400
LabourJMD 4,800
MachineJMD 3,100
OverheadJMD 2,700
Total manufacturing costJMD 29,000
Finished-unit standard for ONT Starter Kit Rev C. The same JMD 29,000 is shown on shop-floor WIP and manufacturing analytics. Margin analysis reads it from product costing, cost centre CC-MFG-KIN.
Work Orders
MO-4414 is 40 ONT Starter Kits for SO-4402, Rev C, due 22 Oct 2026. Open Work Orders 74 is the wider book.
0 selected
| Work Order | Product | Revision | Source | Manufacturing Mode | Fulfilment Strategy | Planned Qty | Due Date | Reserved | Status | |
|---|---|---|---|---|---|---|---|---|---|---|
| MO-4414 | ONT Starter Kit | C | SO-4402 | Discrete | Make-to-Order | 40 | 22 Oct 2026 | Reserved | In Progress | |
| MO-4426 | Outdoor CPE | B | Manual | Discrete | Engineer-to-Order | 12 | 18 Dec 2026 | Short | Planned | |
| MO-4418 | Fibre Cable Assembly | B | planned order | Process | Make-to-Stock | 30 km | 28 Oct 2026 | Reserved | Released | |
| MO-4422 | Optical Splitter Assembly | A | SO-4410 | Discrete | Assemble-to-Order | 80 | 04 Nov 2026 | Partial | Released | |
| MO-4430 | SIM Starter Pack | A | Forecast | Repetitive | Make-to-Stock | 4,000 | 15 Nov 2026 | Reserved | Planned | |
| MO-4434 | Network Power Unit | A | Manual | Discrete | Make-to-Stock | 24 | 20 Nov 2026 | Reserved | Released | |
| MO-4438 | Field Installation Kit | A | PRJ-14 | Project | Make-to-Order | 16 | 02 Dec 2026 | Partial | In Progress | |
| MO-4440 | Parish splice kit | A | North Parish Networks | Contract | Make-to-Order | 60 | 12 Nov 2026 | Reserved | Released | |
| MO-3182 | Sensor kit — industrial v3 | 7 | Manual | Discrete | Make-to-Stock | 2,400 | 09 Aug 2026 | Reserved | In Progress | |
| MO-3180 | Field tablet 10in rugged | 9 | Manual | Discrete | Make-to-Stock | 800 | 11 Aug 2026 | Reserved | In Progress | |
| MO-3178 | Gateway module 5G | 4 | Manual | Discrete | Make-to-Stock | 3,600 | 14 Aug 2026 | Partial | Planned | |
| MO-3175 | POS terminal compact | 2 | Manual | Discrete | Make-to-Stock | 600 | 08 Aug 2026 | Reserved | In Progress | |
| MO-3172 | Access point outdoor | 3 | Manual | Discrete | Make-to-Stock | 1,500 | 18 Aug 2026 | Short | Planned | |
| MO-3169 | Charging dock 8-bay | 6 | Manual | Discrete | Make-to-Stock | 1,200 | 02 Aug 2026 | Released | Complete |
No records match this filter.
Production Plans
Demand is shown as recorded. No planning run is performed.
0 selected
| Plan ID | Product | Demand Source | Quantity | Start Date | Due Date | Work Centre | Status | |
|---|---|---|---|---|---|---|---|---|
| PLN-14 | ONT Starter Kit | SO-4402 | 40 | 12 Oct 2026 | 22 Oct 2026 | WC-OPT | Released | |
| PLN-18 | Fibre Cable Assembly | planned order | 30 km | 14 Oct 2026 | 28 Oct 2026 | WC-REEL | Released | |
| PLN-22 | SIM Starter Pack | Forecast | 4,000 | 01 Nov 2026 | 15 Nov 2026 | WC-KIT | Planned | |
| PLN-26 | Field Installation Kit | PRJ-14 | 16 | 18 Nov 2026 | 02 Dec 2026 | WC-KIT | In Progress | |
| PLN-08 | Sensor kit — industrial v3 | Manual | 2,400 | 04 Aug 2026 | 09 Aug 2026 | Line 4 | In Progress |
No records match this filter.
Reservations
Component stock stays in Inventory. This list is the manufacturing claim on it.
0 selected
| Reservation ID | Work Order | Component | Required Qty | Reserved Qty | Location | Lot | Status | |
|---|---|---|---|---|---|---|---|---|
| RSV-4414-1 | MO-4414 | CMP-HSG-02 Housing | 40 | 40 | Kingston Main Warehouse | LOT-HSG-14 | Reserved | |
| RSV-4414-2 | MO-4414 | CMP-PCB-14 PCB | 40 | 40 | Kingston Main Warehouse | LOT-PCB-14 | Reserved | |
| RSV-4414-3 | MO-4414 | CMP-OPT-03 Optical module | 40 | 40 | Kingston Main Warehouse | LOT-OPT-118 | Reserved | |
| RSV-4414-4 | MO-4414 | CMP-CON-LC Connector | 40 | 20 | Kingston Main Warehouse | — | Partial | |
| RSV-4426-1 | MO-4426 | Outdoor enclosure | 12 | 0 | Kingston Main Warehouse | — | Short |
No records match this filter.
Discrete
Build a defined unit from a BOM and routing.
ExampleONT Starter Kit, MO-4414, 40 units.
PlanningWork order from a sales order.
In use
Process
Recipe, batch size and yield.
ExampleFibre Cable Assembly, 30 km campaign.
PlanningCampaign on WC-REEL.
In use
Repetitive
Rate-based runs of the same item.
ExampleSIM Starter Pack, 4,000.
PlanningForecast plan PLN-22.
Planned
Project
Tied to a project structure.
ExampleField Installation Kit, 16 for PRJ-14.
PlanningProject demand.
In use
Contract
Built for a named contract.
ExampleParish splice kit, 60 for North Parish Networks.
PlanningContract work order.
Released
New Work Order
1 · Order2 · Demand3 · Review
Work orderMO-4442
ProductField Installation Kit
Quantity8
Due09 Dec 2026
Review only. Nothing is released.
Release work order
MO-4426 Outdoor CPE, quantity 12, will show as Released. Reservation stays short. Nothing is posted.