Capacity Planning — NexavionERP
Manufacturing/Capacity Planning
Ana Kowalski
ana@meridianco.com
Log Out

Capacity Planning

Finite load on Kingston and Montego Bay work centres. Hours are displayed as recorded.

Capacity Utilisation82.4%
Plant book
Constrained Work Centres6
Working set shows WC-OPT
Late Orders From Capacity11
MO-4414 is 2 days late
Load this week
Utilisation matches the work-centre table
Work Centres
Effective hours and utilisation are stored figures, not a live schedule.
0 selected
Work CentreDescriptionShiftAvailable HoursEfficiencyEffective CapacityScheduled HoursUtilisationStatus
WC-OPTOptical AssemblyDay16.090%14.415.6
108%
Constrained
WC-REELCable PrepDay16.094%15.012.6
84%
Near Capacity
WC-QAInspectionDay8.095%7.66.4
84%
Near Capacity
WC-KITKittingDay16.092%14.711.2
76%
Available
WC-PCKPackDay8.093%7.45.1
69%
Available
WC-MOBMontego Bay FitDay8.088%7.04.2
60%
Available
No records match this filter.
Finite Schedule
Sequence-dependent setup is shown on the campaign. The sequence is not recalculated.
0 selected
Work CentreWork OrderOperationStartFinishSetupRunCampaign
WC-OPTMO-441420 Optical fit12 Oct 08:0012 Oct 16:000.4 h6.2 hSetup: Connector Type Change
WC-OPTMO-442220 Splitter fit13 Oct 08:0013 Oct 15:000.6 h5.4 hSetup: Connector Type Change
WC-REELMO-441810 Cable prep14 Oct 08:0016 Oct 16:001.2 h18.0 hCampaign: Fibre gel
WC-KITMO-443410 Kitting20 Oct 08:0020 Oct 12:000.2 h3.4 hSetup: None
WC-QAMO-441430 Inspection21 Oct 08:0021 Oct 12:000.2 h3.0 hSetup: None
No records match this filter.
Constraint driving late order
WC-OPT — Optical Assembly — Capacity utilisation 108%

Eleven late orders are attributed to capacity in the plant book. MO-4414, 40 ONT Starter Kits for SO-4402, is the latest impact and is 2 days late. No schedule is regenerated.

Bottlenecks
Constraint type is recorded against the work centre.
0 selected
Work CentreConstraintUtilisationAffected OrdersLatest ImpactLate DaysStatus
WC-OPTCapacity108%11MO-44142Constrained
WC-REELSetup84%4MO-44180Near Capacity
WC-QALabour Skill84%3MO-44141Near Capacity
WC-KITTool76%2MO-44340Available
WC-MOBCalendar60%1MO-44380Available
No records match this filter.
Work Centre Calendar
Shift, efficiency and planned downtime.
0 selected
Work CentreShiftCalendarEfficiencyWorking HoursPlanned Downtime
WC-OPTDayKingston 5-day90%08:00–16:00None this week
WC-OPTEveningKingston 5-day88%16:00–22:00Friday 16:00–18:00
WC-REELDayKingston 5-day94%08:00–16:00Reel change 14 Oct 12:00
WC-MOBDayMontego Bay 5-day88%08:00–16:00Public holiday 20 Oct
No records match this filter.