Process & Batch Manufacturing
Recipes and batch records for process runs. Discrete ONT assembly stays on the work order.
Active Recipes64
Plant book
Batches In Process12
BCH-220 is the open fibre batch
Batch Records Pending Sign-off4
BCH-218 is in this set
Recipes
Ingredient quantities are the standard for a 1 km batch. They are not scaled here.
0 selected
| Recipe ID | Product | Revision | Batch Size | Ingredients | Process Steps | Status | |
|---|---|---|---|---|---|---|---|
| RCP-FBR-01 | Fibre Cable Assembly | B | 1 km | 6 | 4 | Effective | |
| RCP-GEL-02 | Gel fill compound | A | 20 L | 4 | 3 | Approved | |
| RCP-SPL-04 | Splitter potting | A | 10 units | 5 | 3 | Draft | |
| RCP-OLD-01 | Legacy jacket compound | C | 50 L | 3 | 2 | Retired |
No records match this filter.
Batches
BCH-220 actual 9.4 km on a 10 km plan. Co-product and by-product are recorded, not costed.
0 selected
| Batch No. | Product | Recipe | Planned Quantity | Actual Quantity | Yield | Co-product | By-product | Status | |
|---|---|---|---|---|---|---|---|---|---|
| BCH-220 | Fibre Cable Assembly | RCP-FBR-01 | 10 km | 9.4 km | 94.0% | Offcut reel | Gel residue | In Process | |
| BCH-218 | Fibre Cable Assembly | RCP-FBR-01 | 10 km | 9.6 km | 96.0% | Offcut reel | Gel residue | Under Review | |
| BCH-214 | Gel fill compound | RCP-GEL-02 | 20 L | 20 L | 100% | — | — | Complete | |
| BCH-210 | Splitter potting | RCP-SPL-04 | 10 | — | — | — | — | Planned |
No records match this filter.
Process Parameters
BCH-220 pressure 2.3 bar is above the 2.0 bar limit. No limit is recalculated.
0 selected
| Batch | Step | Parameter | Target | Lower Limit | Upper Limit | Actual | Status | |
|---|---|---|---|---|---|---|---|---|
| BCH-220 | Gel fill | Temperature | 72 C | 68 C | 76 C | 73 C | Within Range | |
| BCH-220 | Gel fill | Pressure | 1.8 bar | 1.6 bar | 2.0 bar | 2.3 bar | Out of Range | |
| BCH-220 | Jacket | Mixing Time | 12 min | 10 min | 14 min | 12 min | Within Range | |
| BCH-220 | Jacket | Flow Rate | 4.2 m/min | 3.8 m/min | 4.6 m/min | 4.1 m/min | Within Range | |
| BCH-220 | Cure | Hold Time | 40 min | 35 min | 45 min | 40 min | Within Range |
No records match this filter.
Electronic record complete
Batch BCH-220 has a full step log
Electronic signature required before the record leaves Under Review. No signature is captured.
Electronic signature required
Batch record
BCH-220 fibre campaign
Gel fill recorded
Keisha Morgan logged temperature 73 C and pressure 2.3 bar.
Jacket step signed
Omar Reid signed the jacket hold.
Sign-off waiting
Nadine Blake, quality. Signature state Pending.
Recipe revisionB
Batch size1 km
IngredientsFibre 1.02 km, gel 4.6 L, jacket 18 kg, ripcord, binder, marker ink
Process parametersTemperature, pressure, mixing, flow, hold
Yield96% standard
Co-productOffcut reel — shared production cost
By-productGel residue — credited JMD 300 per km
Sign off batch
BCH-218 will show as Complete. The signature line stays a visual record. Nothing is signed electronically.