Manufacturing Analytics
OEE, yield and the cost that margin analysis can trust. Figures are stored, not recalculated.
Overall OEE78.6%
Plant book
Yield94.8%
Same first-pass yield as the shop floor
Scrap Rate2.7%
Plant book
OEE by work centre
Availability, performance and quality are stored with the OEE figure
Finished unit cost
ONT Starter Kit Rev C
MaterialJMD 18,400
LabourJMD 4,800
MachineJMD 3,100
OverheadJMD 2,700
Total manufacturing costJMD 29,000
Same standard as Production Planning and the MO-4414 WIP drawer. Read onward in product costing.
OEE
Overall OEE 78.6% is the plant figure. These four centres are the working set.
| Work Centre | Line | Availability | Performance | Quality | OEE |
|---|---|---|---|---|---|
| WC-OPT · Optical Assembly | Line 1 | 91.2% | 87.4% | 96.1% | 76.7% |
| WC-REEL · Cable Prep | Line 2 | 94.1% | 91.3% | 97.2% | 83.5% |
| WC-KIT · Kitting | Line 3 | 88.4% | 84.0% | 96.0% | 71.4% |
| WC-PCK · Pack | Line 4 | 90.2% | 86.1% | 95.6% | 74.2% |
No records match this filter.
Yield & Quality
ONT optical fit is 18 good, 1 scrap and 1 rework against 40 planned.
0 selected
| Product | Operation | Shift | Planned Qty | Good Qty | Yield | Scrap | Rework | Status | |
|---|---|---|---|---|---|---|---|---|---|
| ONT Starter Kit | 20 Optical fit | Day | 40 | 18 | 90.0% | 1 | 1 | Watch | |
| Fibre Cable Assembly | 10 Cable prep | Day | 10 km | 9.4 km | 94.0% | 0.4 km | 0 | Stable | |
| Sensor kit — industrial v3 | 40 Final | Day | 460 | 412 | 96.5% | 8 | 6 | Stable | |
| POS terminal compact | 30 Test | Day | 160 | 122 | 88.4% | 11 | 7 | Watch |
No records match this filter.
Scrap & Rework
Primary reason is recorded on the confirmation.
0 selected
| Product | Operation | Shift | Scrap Qty | Scrap Rate | Rework Qty | Rework Rate | Primary Reason | |
|---|---|---|---|---|---|---|---|---|
| ONT Starter Kit | 20 Optical fit | Day | 1 | 5.0% | 1 | 5.0% | Material Defect | |
| POS terminal compact | 30 Test | Day | 11 | 6.9% | 7 | 4.4% | Machine Issue | |
| Sensor kit — industrial v3 | 40 Final | Day | 8 | 1.7% | 6 | 1.3% | Setup Error | |
| Fibre Cable Assembly | 10 Cable prep | Day | 0.4 km | 4.0% | 0 | 0% | Process Deviation |
No records match this filter.
Operation and input most associated with anomaly
Optical Assembly / Connector Batch C-204
Machine-generated
Expected quality on Optical Assembly is 96.1%. MO-4414 observed yield on operation 20 is 90.0%. The associated input is connector batch C-204. No detector is running.
Yield Anomalies
One open alert in the working set.
0 selected
| Alert ID | Product | Operation | Input | Expected Yield | Observed Yield | Variance | Associated Factor | Severity | Status | |
|---|---|---|---|---|---|---|---|---|---|---|
| ALR-204 | ONT Starter Kit | 20 Optical fit | Connector batch C-204 | 96.1% | 90.0% | −6.1 pt | Optical Assembly / Connector Batch C-204 | High | Open |
No records match this filter.
Work orderMO-4414
Operation20 Optical fit
ShiftDay
OperatorKeisha Morgan
Produced18
Scrap1
Rework1
ConfirmationCF-4414 · 05 Oct 2026 11:40
Sales order SO-4402. Finished-unit cost JMD 29,000. Plant yield KPI stays 94.8%.