Shop Floor Control
Execution of released work. MO-4414 shows 18 produced, 1 scrap, 1 rework, and 20 still in WIP.
| Work Order | Product | Operation | Work Centre | Planned Qty | Produced | Scrap | Rework | Status | |
|---|---|---|---|---|---|---|---|---|---|
| MO-4414 | ONT Starter Kit | 20 Optical fit | WC-OPT | 40 | 18 | 1 | 1 | Running | |
| MO-3182 | Sensor kit — industrial v3 | 40 Final | Line 4 | 2,400 | 1,860 | 22 | 14 | Running | |
| MO-3180 | Field tablet 10in rugged | 30 Assembly | Line 1 | 800 | 510 | 6 | 4 | Running | |
| MO-3178 | Gateway module 5G | 10 Kitting | Line 5 | 3,600 | 0 | 0 | 0 | Ready | |
| MO-3175 | POS terminal compact | 30 Test | Line 7 | 600 | 420 | 18 | 9 | Hold | |
| MO-4418 | Fibre Cable Assembly | 10 Cable prep | WC-REEL | 30 km | 12 km | 0.4 km | 0 | Running | |
| MO-3169 | Charging dock 8-bay | 40 Pack | Line 8 | 1,200 | 1,200 | 8 | 3 | Complete |
| Sample ID | Line | Product | Check | Result | Time |
|---|---|---|---|---|---|
| QC-2231 | Line 4 | Sensor kit — industrial v3 | Seal integrity | Pass | 09:42 |
| QC-2230 | Line 7 | POS terminal compact | Touchscreen calibration | Fail | 09:31 |
| QC-2229 | Line 1 | Field tablet 10in rugged | Drop test — corner | Pass | 09:18 |
| QC-2228 | Line 5 | ONT Starter Kit | Optical power | Pass | 09:04 |
| QC-2227 | Line 8 | Charging dock 8-bay | Thermal cycling | Pass | 08:52 |
| QC-2226 | Line 7 | POS terminal compact | Touchscreen calibration | Fail | 08:40 |
| Confirmation ID | Work Order | Operation | Work Centre | Produced | Scrap | Rework | Labour Time | Machine Time | Confirmed By | Time | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| CF-4414 | MO-4414 | 20 Optical fit | WC-OPT | 18 | 1 | 1 | 1.6 h | 2.1 h | Keisha Morgan | 05 Oct 2026 11:40 |
CMP-CON-LC on MO-4414 was issued manually against serial batch SN-CON-204. Optical modules backflushed from lot LOT-OPT-118. On-hand stock remains in inventory.
| Issue ID | Work Order | Component | Required | Issued | Issue Method | Lot/Serial | Status | |
|---|---|---|---|---|---|---|---|---|
| ISS-4414 | MO-4414 | CMP-OPT-03 Optical module | 40 | 20 | Backflush | LOT-OPT-118 | Issued | |
| ISS-4415 | MO-4414 | CMP-CON-LC Connector | 40 | 20 | Manual | SN-CON-204 | Partial | |
| ISS-3182 | MO-3182 | Sensor housing | 2,400 | 1,860 | Backflush | LOT-SEN-48 | Issued |
| Work Order | Product | Operation | Quantity | Unit Cost | WIP Value | Age | Status | |
|---|---|---|---|---|---|---|---|---|
| MO-4414 | ONT Starter Kit | 20 Optical fit | 20 | JMD 21,200 | JMD 424,000 | 6 days | In Process | |
| MO-3182 | Sensor kit — industrial v3 | 40 Final | 540 | JMD 6,400 | JMD 3,456,000 | 4 days | In Process | |
| MO-4418 | Fibre Cable Assembly | 10 Cable prep | 18 km | JMD 185,000 | JMD 3,330,000 | 3 days | In Process | |
| — | Other Kingston WIP | Several | — | — | JMD 11,430,000 | — | Book |
Readings are stored samples. No machine, broker or gateway is contacted.
| Machine | Work Centre | Source | Protocol | Last Reading | Status |
|---|---|---|---|---|---|
| MC-OPT-01 | WC-OPT | Optical bench | OPC UA | 05 Oct 2026 11:42 | Connected |
| MC-REEL-02 | WC-REEL | Cable line | MQTT | 05 Oct 2026 11:38 | Connected |
| MC-KIT-04 | WC-KIT | Kitting cell | REST Gateway | 05 Oct 2026 11:20 | Connected |
| MC-MOB-01 | WC-MOB | Montego Bay fit | Modbus | 05 Oct 2026 10:55 | Delayed |
Confirmed by Keisha Morgan. Work order MO-4414, operation 20, WC-OPT. Finished-unit standard remains JMD 29,000.
20 units still at optical fit. Unit WIP JMD 21,200. A finished unit is JMD 29,000 (material 18,400, labour 4,800, machine 3,100, overhead 2,700) on product costing. Stock locations stay in inventory.
MO-3178 Gateway module 5G, operation 10 Kitting, will show as Running. Produced, scrap and rework stay at zero. Nothing is posted.