Asset Lifecycle & Reliability
Phase, cost and failure stay on the asset
Assets in Operate Phase11,260
AST-OLT-014 is in Operate
Fleet Availability98.6%
This chassis is 99.8%
Repeat-Failure Assets23
▼ The OLT is rank 1 in the working set
Plan to dispose
Plan→Procure→Install→Commission→Operate→Maintain→Upgrade→Retire→Dispose
Gates
Pass Gate is available when the evidence is on the record.
0 selected
| Asset | Current Phase | Next Gate | Required Evidence | Gate Status | |
|---|---|---|---|---|---|
| AST-OLT-014 | Operate | Maintain | Work history — checklist — photos | Open | |
| AST-BAT-014 | Maintain | Operate | Load test missing | Evidence Missing |
No records match this filter.
Acquisition through downtime
2,400,000 + 180,000 + 90,000 + 140,000 + 20,000 + 15,000 + 310,000 + 45,000 = JMD 3,200,000. Value from Fixed Assets
Cost of ownership · AST-OLT-014
Total JMD 3,200,000. Figures are stored, not calculated on the page.
0 selected
| Component | Amount | Source | |
|---|---|---|---|
| Acquisition | JMD 2,400,000 | Value from Fixed Assets | |
| Internal Labour | JMD 180,000 | Value from Fixed Assets | |
| Contractor Labour | JMD 90,000 | Value from Fixed Assets | |
| Parts | JMD 140,000 | Value from Fixed Assets | |
| Travel | JMD 20,000 | Value from Fixed Assets | |
| Tools | JMD 15,000 | Value from Fixed Assets | |
| Energy | JMD 310,000 | Value from Fixed Assets | |
| Downtime | JMD 45,000 | Value from Fixed Assets |
No records match this filter.
Failure class, problem, cause, remedy
WO-2208 is a corrective order with no code. Closure stays blocked.
Closure blocked WO-2208 has no failure code.
Coded failures
FC-014 is the coded record on WO-4414.
0 selected
| Code | Asset | Class | Problem | Cause | Remedy | Status | |
|---|---|---|---|---|---|---|---|
| FC-014 | AST-OLT-014 | Power | Low optical power | Connector batch | Replace card | Coded |
No records match this filter.
Bad actors
Rank 1 is the Kingston OLT. The drawer lists the work orders.
0 selected
| Rank | Name | Cost | Downtime Hours | Repeat Failures | Score | |
|---|---|---|---|---|---|---|
| 1 | AST-OLT-014 | JMD 40,500 | 3.2 | 2 | 86 |
No records match this filter.
Criticality and failure modes
A, B and C. Strategy is preventive, predictive, run-to-failure or redesign.
0 selected
| Asset Class | Safety | Service Impact | Cost | Criticality | Failure Mode | Recommended Strategy | |
|---|---|---|---|---|---|---|---|
| OLT Chassis | High | 184 subscribers | JMD 40,500 | A | Optical loss | Predictive | |
| Generator | Medium | Site power | JMD 18,000 | B | Fail to start | Preventive | |
| ONT | Low | One customer | JMD 4,200 | C | No light | Run-to-Failure |
No records match this filter.
Repair
Machine-generated Lifetime cost JMD 3,200,000. Failure frequency 2. Remaining life 6 years. Criticality A. Replacement cost JMD 2,400,000.
Repair score 72
Replace score 41
Candidates
Recommendation is repair for AST-OLT-014.
0 selected
| Asset | Recommendation | Repair Score | Replace Score | Status | |
|---|---|---|---|---|---|
| AST-OLT-014 | Repair | 72 | 41 | Repair |
No records match this filter.
Reliability
Availability uses the stored MTBF and MTTR.
0 selected
| Asset | MTBF | MTTR | Availability % | |
|---|---|---|---|---|
| AST-OLT-014 | 4,200 | 8.4 | 99.8% |
No records match this filter.
Pass gate
AST-OLT-014 has the work history, the checklist and the photographs. Passing records the Operate to Maintain gate. Value is unchanged.