New Product Introduction

A product reaches release only after the gates, and only with engineering approval

Active Introductions18
Five are at a gate
At Gate Review5
▼ 1 passed prototype
On-Time Introduction Rate91.6%
▲ 1.2pt
Introduction portfolio
18 introductions are active. NPI-08 closed into the released ONT Starter Kit Rev C. NPI-14 is the Outdoor CPE still under review.
0 selected
NPI IDProductProduct ClassOwnerCurrent StageTarget ReleaseGate StatusHealth
NPI-14Outdoor CPECustomer PremisesKM Keisha MorganValidation18 Dec 2026At ReviewAt Risk
NPI-11OLT line cardExchange EquipmentAP Andre PowellPrototype20 Jan 2027OpenOn Track
NPI-08ONT Starter KitAccess TerminalKM Keisha MorganRelease12 Aug 2026ApprovedOn Track
NPI-04Parish drop kitOutside PlantOR Omar ReidConcept—Not startedBlocked
No records match this filter.
NPI-14 timeline
Outdoor CPE · Validation
Validation gate booked
Criteria still open on the housing rating
01 Oct
Prototype review passed
Rev B enclosure accepted for trial
12 Sep
Design review passed
CFG-CPE option classes named
02 Aug
Concept approved
PRD-CPE-22 opened in Development
14 Jun
Concept Approval→Design Review→Prototype Review→Validation→Pilot→Release
Stage gates · NPI-14
Validation is the current gate. Release stays closed while PRD-CPE-22 is under review.
GateOwnerCriteriaDeliverablesDecisionDate
Concept ApprovalKM Keisha MorganMarket and class namedBriefApproved14 Jun 2026
Design ReviewAP Andre PowellOption classes namedCFG-CPEApproved02 Aug 2026
Prototype ReviewNB Nadine BlakeRev B enclosure trialPrototype notesApproved12 Sep 2026
ValidationKM Keisha MorganHousing rating and substance limitTest packPending01 Oct 2026
PilotOR Omar ReidKingston bench slotPilot planNot started—
ReleaseAP Andre PowellEngineering approval on Rev BRelease packBlocked—
No records match this filter.
Deliverables
Gate requirements for NPI-14. Completion is the recorded percent, not a calculation.
DeliverableNPIStageOwnerDue DateCompletionGate RequirementStatus
Housing rating testNPI-14ValidationNB Nadine Blake30 Oct 2026
40%
Gate requirementOpen
Substance declarationNPI-14ValidationOR Omar Reid15 Nov 2026
20%
Gate requirementOpen
CFG-CPE modelNPI-14DesignKM Keisha Morgan02 Aug 2026
100%
Gate requirementDone
Pilot planNPI-14PilotAP Andre Powell02 Dec 2026
0%
Gate requirementNot started
No records match this filter.
Project structure
NPI-14 → PRJ-14
ProjectPRJ-14
WorkstreamOutdoor CPE
OwnerKeisha Morgan
BudgetJMD 4,800,000
At Risk
Capital plan
PRJ-14 → CAP-14
Capital itemOptical bench extension
NPINPI-14
Planned amountJMD 2,400,000
GCT 15%JMD 360,000
ApprovalPending
Planned date02 Dec 2026
Linkage
NPI → Project Structure → Capital Plan
NPI-14 Outdoor CPE→PRJ-14→CAP-14 · JMD 2,400,000 plus GCT JMD 360,000