Supply Planning — NexavionERP
Inventory/Supply Planning
Ana Kowalski
ana@meridianco.com
Log Out

Supply Planning

Net requirements, policies, a feasible plan, and the worklist ranked by materiality

Planned Orders128
▲ 6 this week
Open Exceptions17
▼ 3 since Monday
Service Level96.2%
▲ 0.4pt vs last month
Net requirements
Net requirement is demand + safety stock − on hand − in transit − firm supply. ONT Starter Kit: 240 + 40 − 160 − 50 − 30 = 40. Where that result is below zero, the net requirement is 0. The 1:8 fiber splitter is 80 + 40 − 400.
0 selected
ItemDemandOn-HandIn-TransitSafety StockFirm SupplyNet RequirementPlanned OrderStatus
ONT Starter Kit2401605040304040 · 22 Oct 2026Planned
48-core fiber cable70 km50 km0 km10 km0 km30 km30 km · 20 Oct 2026Planned
SIM Starter Pack5,0004,000600200400200200 · 25 Oct 2026Planned
1:8 fiber splitter8040004000—Released
No records match this filter.
Replenishment policies
Parameters are the live policy. Edit stores nothing.
ItemLocationPolicyParametersStatus
ONT Starter KitKingston Main WarehouseReorder PointROP 120Active
48-core fiber cableKingston Main WarehouseMin-MaxMin 20 / Max 60Active
SIM Starter PackKingston Main WarehouseDemand-DrivenBuffer 400Active
1:8 fiber splitterMandeville Field StoreRequirements-BasedHorizon 4 weeksReview
No records match this filter.
Safety stock
ONT Starter Kit current safety stock is 40, the same figure used in net requirements.
ItemDemand VariabilityLead-Time VariabilityTarget Service LevelCurrent vs Recommended
ONT Starter Kit184 days97%40 / 40Machine-generatedPending
48-core fiber cable6 km5 days95%10 km / 12 kmMachine-generatedPending
SIM Starter Pack2406 days98%200 / 200Machine-generatedApplied
No records match this filter.
74%
Supplier capability
Parish ONT Works and Harbour Fiber Supply
81%
Calendar
Kingston staging days still open this month
92%
Feasible plan
Infeasible plans are never produced
Plan statusFeasible plan
Orders moved by constraints
Dates moved only when a constraint required it.
OrderOriginal DatePlanned DateConstraint
PO-441818 Oct 202622 Oct 2026Capacity
TRF-442218 Oct 202621 Oct 2026Calendar
PO-442616 Oct 202618 Oct 2026Supplier capability
No records match this filter.
Planner worklist
Ranked by materiality. 17 exceptions are open on the book.
0 selected
RankExceptionItemMaterialitySuggested ActionStatus
1Excess48-core fiber cableJMD 1,850,000Hold the Montego Bay 10 kmOpen
2Stockout RiskONT Starter KitJMD 276,000Release the planned order of 40Open
3Late SupplySIM Starter PackJMD 252,000Keep TRF-4426 on 16 OctOpen
4ExpediteOLT line cardUSD 18,600Pull the repair-pool card forwardOpen
5CancelDrop cable 2-coreJMD 9,600Leave the negative balance blockedActioned
No records match this filter.
Network
The buy is 40 at Kingston. That 40 keeps 20 and transfers 20: 10 to Montego Bay and 10 to Mandeville, of which 4 continues to the van.
Kingston Main WarehouseCentral4020 out
Montego Bay DepotRegional1010 in
Mandeville Field StoreRegional1010 in
Technician Van — Spalding RouteField44 in
Requirements
Mandeville’s 10 covers 6 at the store and 4 on the van. Kingston keeps 20 and transfers 20.
NodeEchelonNet RequirementPlanned Transfer
Kingston Main WarehouseCentral4020 out
Montego Bay DepotRegional1010 in
Mandeville Field StoreRegional1010 in
Technician Van — Spalding RouteField44 in
No records match this filter.
Nexavion AI● Online
Ask about anything in Inventory — try: