Facilities Ops
Building systems, HVAC, medical gas, and energy performance across the campus.
Facility WOs Open
96
Building Systems Health
97.1%
HVAC / Medical Gas Alerts
2
Energy/Utility Variance
+1.8%
Facility WO Category
HVAC · 37
Electrical · 29
Plumbing/Other · 30
Energy Usage — 30 Day
Open Facility Work Orders
WO ID
Description
System
Status
WO-4711
AHU-3 filter differential pressure alarm
HVAC
In Progress
WO-4698
Medical gas manifold pressure check — Bldg 3
Med Gas
Open
WO-4680
Emergency generator load test — Bldg 1
Electrical
Scheduled
✨
AI Insights
✨ AI-GENERATED79% conf.
AHU-3 filter pressure trend suggests replacement is due 9 days ahead of the standard PM cycle.
Source: PM sensor trend →✨ AI-GENERATED83% conf.
Building 3 medical gas manifold is a single point of failure for 14 critical assets — see Dependency Mapping.
Source: Dependency Mapping →✨ AI-GENERATED70% conf.
Energy variance is trending upward in Bldg 2 — likely linked to an aging chiller nearing end of service life.
Source: Capital & Replacement →