14:52SEIRETSU-FIELD · LTE · 82%
FTTH Field Survey
Annex A · Survey Packet {{ packetId }}
{{ screenTag }}
PACKET CONTROL
{{ f.label }}
A — CENTRAL OFFICE / HEADEND
Facility checklist — pass/fail with photo evidence
{{ f.label }}
ODF TERMINATION LOG
B — OSP ROUTE & POLES
Repeatable pole / structure records
C — NETWORK ACCESS POINT
NAP station records
D — RESIDENTIAL DROP & PREMISES
Drop method
Road crossing required
Demarcation hardware
Route sketch
✏️ Sketch canvas — draw drop route from NAP to demarc
E — REMEDIAL WORK & DEFECTS
Each defect becomes a work order on submission
MODULE 6 — PRE-SURVEY CHECKLIST
Tap to toggle Ready / Missing
{{ g.title }}
Survey Packet Submitted
Project record, defect work orders and as-built GIS entry created
SURVEY SIGN-OFF
PACKET SUMMARY
{{ summary }}
Lead Surveyor *
{{ soName }}
Operations Reviewer
Annex A · evidence source for network inventory, defect WOs & billable capture
Field Survey Tool
Digitizes the FTTH Field Engineering Survey Packet (Annex A). On submission the packet genuinely creates a project record in Fiber Construction and one defect work order per captured defect in Field Service.
Annex A · Modules A–E + Pre-Survey